Mo-Sys has opened a new three-storey facility at Canada Water in London after reorganising the business. The site brings product development, engineering and administration together with a working hybrid presentation and production theatre.

The theatre includes immersive LED walls, real-time augmented-reality processing, camera robotics, multi-camera broadcast production and live-streaming capability. Green rooms and event spaces allow the building to host client sessions and actual productions as well as demonstrations.

Putting development next to a live environment can shorten the path between engineering changes and production testing. It also gives customers a place to validate tracking, graphics, camera moves and LED workflows as one system rather than as isolated products.

The announcement does not disclose stage dimensions, LED specification, camera count, tracking architecture or booking model. Its value as a reference facility will depend on how closely demonstrations reproduce real customer latency, lighting and failover constraints.