Qvest has delivered Asharq's new broadcast station at SRMG headquarters in Riyadh and says the broadcaster moved its continuous live news operation from Dubai in a two-month migration without interrupting transmission. The facility spans four floors plus a rooftop satellite farm and combines four studios, two newsrooms, post-production, graphics, media management, archive, master control, playout, transmission and corporate IT. The newsroom areas are designed to support as many as 160 journalists.
The studios have deliberately different operating profiles. Two 350-square-metre rooms handle larger productions: Studio 1 combines three robotic camera chains, two manual pedestal cameras, a tracked crane and six video walls, while Studio 2 uses four robotic chains, a tracked crane and seven walls for highly automated bulletins and virtual production. A 250-square-metre third studio covers daily news and interviews, and a 150-square-metre green-screen room is assigned to XR, financial data, elections and breaking-news formats.
A shared SMPTE ST 2110 infrastructure forms the production core. Qvest identifies PTP synchronisation, redundancy and hitless switching as resilience mechanisms, although it does not name the underlying network or control vendors. Fibre links connect the new KAFD station with facilities in Cairo and Riyadh's Diplomatic Quarter, allowing production resources to be operated centrally and supporting distributed workflows with smaller remote crews. The result is a single IP environment spanning newsroom, studio and distribution rather than a collection of isolated production islands.
Qvest's account confirms the project scope and attributes the uninterrupted cutover claim to the integrator and broadcaster, but it does not publish measured outage data, network capacity, NMOS control details, redundancy topology, failure-domain tests or end-to-end latency. Archive scale, cybersecurity controls, automation limits, disaster-recovery arrangements and the vendor list also remain open. The deployment is therefore a substantial documented facility migration, while operational resilience and efficiency still require evidence beyond the launch announcement.